And on the seventh day…
And on the seventh day…

And on the seventh day…

…HE pronounced… “Let there be Plumbing”. At last the plumbing is in place for the new bathroom.

  • Ejector pump and sewage lines have been buried under rock and cement.
  • The wall frammed.
  • The sink drainage and vent lines run along the back wall
  • Vent Stack tied to the new vent running through the baby’s room wall.
  • Supply lines brought to the shower, the clothes washer, and the utility sink.
  • The ejector “turd tube” roughed in.

Nothing is tied in just yet as that will require some time to shut the water off in the house which is not too popular with a pregnant woman in the house, but it will be soon.