… or at least that’s what I keep telling myself. Indeed, a mountain of work has been crossed off the list, but the remaining elephant in the room is the bathroom. That is tomorrow-Matt’s problem.
Flooring, trim and doors all came fast after the paint was freshly rolled.









It seemed like minutes after the trim was installed, the movers came and filled the space to capacity (the bedroom is literally filled to the brim).


Next came the fireplace tile and some touch-up work and flooring upstairs.