Evolution of a Shower 2
Evolution of a Shower 2

Evolution of a Shower 2

Monday night, Carlos and his cousin stayed until 10 pm. Carlos and I finished up the last items on the to do list before the insulation was installed Tuesday while his cousin poured the shower pan and set the slope for the drain.  It was a long evening after a long day of work… but the shower is now in place. wpid-20140428_230036From here I will put the bathroom on the backburner to get higher priority things done before the baby is born. The shower and bathroom floor will be tiled, vanity installed and finishing touches put in… all hopefully soon after jr arrives.

Previous Shower post